Project Introduction: The project has a capacity of 400 MW and is designed to install a total of 68 wind turbine units: 38 units with a capacity of 5.6 MW each and 30 units with a capacity of 6.25 MW each. Within the wind farm, 16 35-kV collector lines will connect to a newly constructed 110-kV collection substation. Upon completion and commissioning, the project will provide stable and reliable clean energy to the local area and surrounding regions. It is expected to generate an average annual output of 1 billion kilowatt-hours, saving approximately 300,000 tons of standard coal annually and reducing carbon dioxide emissions by about 8.4 million tons. This will make a positive contribution to the region’s high-quality economic and social development as well as to ecological conservation.